
Sectors · Roads & bridges
Roads that connect the Kingdom’s cities
Arterial roadways, road crossings and large-scale earthworks, backed by five decades of building since the Abu-Aljadail road in 1975.
Our roots
Roads are where we started
Our first recorded project, the Abu-Aljadail road, was completed in 1975.
Since then, our teams have carried out excavation works for Jeddah’s new airport and for the Haramain High-Speed Railway. Today they build the lighting and power systems along Madinah’s arterial roadways, and the crossings that take our pipelines under roads and utilities.
What we build
From the ground up
Arterial roadway infrastructure
Public lighting, cabling, substations and site reinstatement on major arterial roads.
Road and utility crossings
Pipeline crossings under roads and utilities, with shaft works.
Earthworks
Excavation, levelling and backfilling at scale: more than 1.5 million m³ on a single project.
Rail and airport excavation
Excavation works for the Haramain High-Speed Railway (2012) and Jeddah’s new airport (1995).

Earthworks at scale
The ground work beneath every road
On Phase 3 of the Al Jubail to Riyadh Water Transmission System, our teams moved more than 1.5 million m³ of earth, with 100+ items of equipment and 200+ professionals on site.
The same capacity prepares the ground for roads, crossings and utility corridors.
Do you have a project? Let’s discuss it.
Tell us what you need to build. We’ll come back to you with a clear plan, a realistic schedule and one accountable team.


